data center dilemma

Results 1 - 2 of 2Sort Results By: Published Date | Title | Company Name
Published By: NetApp     Published Date: Sep 21, 2017
In the current landscape of modern data centers, IT professionals are stretched too thin. Triage situations are the norm and tend to reduce the time spent on strategic business objectives. This paper offers a solution to this IT dilemma, outlining the ways to achieve a storage infrastructure that enables greater performance and capacity.
Tags : 
netapp, database performance, flash storage, data management, cost challenges, all-flash
    
NetApp
Published By: HP Data Center     Published Date: Mar 25, 2009
To accommodate increasingly dense technology environments, increasingly critical business applications, and increasingly stringent service level demands, data centers are typically engineered to deliver the highest-affordable availability levels facility-wide. Within this monolithic design approach, the same levels of mechanical, electrical, and IT infrastructure are installed to support systems and applications regardless of their criticality or business risk if unplanned downtime occurs. Typically, high redundancy designs are deployed in order to provide for all eventualities. The result, in many instances, is to unnecessarily drive up both upfront construction or retro-fitting costs and ongoing operating expenses.
Tags : 
hp data center, hybrid data center, dense technology environments, hybrid data center, critical business applications, it infrastructure, high redundancy designs, pods, right sizes, computer networks and subsystems, uninterruptible power supplies, ups, telecommunications equipment, data center dilemma, total cost of ownership, tco, always-on applications, redundant mep, multi-tiered (pod), monolithic tier
    
HP Data Center
Search Resource Library